META TITLE

Projects in Lithuania


2014-2015, Rokiškis
"Panevėžio energija" UAB Rokiškis boiler room 2x5.0 MW biofuel boilers with the condensing economizer and other technological equipment.
 

 

 

2014, Prienai

1x5.0 MW and 1x2.5 biofuel boilers


 
 
 


2014, Ariogala
1x 3.09 MW biofuel boiler
   

    
2015, Klaipėda
Assembly of the 2x0.25 MW gas container boiler room
  
  
 
2015, Venta
"Akmenės energija" UAB biofuel boiler 1x2.0MW with the condensing economizer and other technological equipment


 
2014-2015, Anykščiai
"Anykščių šiluma" UAB biofuel boiler 1x4.0 MW with the condensing economizer and other technological equipment
 

 
2015, Klaipėda
Holding construction of the flue, height 64.92 m and Ø2600 mm
 


2016, Vievis
"Iviltra" UAB stainless steel tanks 70 m3  x 2 units

   

2016, Naujoji Akmenė
"Eternit Baltic" UAB,  Ø10 m mixer x 1 unit, silos 60 m3 2 x units, 100 m3 x 1 unit and 180 m3 x 2 units.; and other tanks

  

2016, Klaipėda
For the power plant of 1.5 MW capacity - 12.4 t / h (10.2 MW) of 470 ° C, 34 bar steam boiler with economizer

   

   

2016, Anykščiai
"Axis Technologies" UAB economizers for 2 MW and 4 MW capacity boilers 

  

2016, Pakruojis county
The cyclone from Hardox 450 steel x 2 units. 

  

2016, Klaipeda
44 m3 stainless steel tank for liquid fuel
  

2016, Visaginas
„Pramones energija“ UAB chimney height 25 m and diameter Ø1300 mm 
  

2016, Svencionis
„Fortum Švenčionių energija“ UAB 50 m3 double wall tank for liquid fuel
  

2016, Naujoji Akmene
"Eternit Baltic" UAB stainless steel covers
  

2016, Panevėžys
"Panevėžio stiklas" AB glass products collection table
  

2016, Pakruojis county
Blades from Hardox 500 steel
  

2017, Kaunas
„Kauno energija“ AB 1x18 MW natural gas boiler and 1x1,5 MW economizer for Pergalė boiler house 
   

2017, Mažeikiai

1x1,5 MW biofuel boiler


2017, Rietavas
580 kW economizer and chimney height 18 m and diameter Ø1100 mm


2017, Klaipėda
Separator D600


2017, Kaunas

„Kauno energija“ AB 3 x1,5 MW economizer for Pergalė boiler house 


2018, Kaunas

„Kauno energija“ AB 3x18 MW natural gas boiler
 

2018, Pakruojis county
Blades from Hardox 500 steel



2018, Panevėžys
Chimney height 14,9 m and diameter Ø600 mm


2018, Panevėžys
AB "Panevėžio keliai" 50 m3 tank


2018, Panevėžys
AB "Panevėžio energija" Panevėžys RK1 boiler room 8,0 MW biofuel boiler with the condensing economizer and other technological equipment.


2018, Molėtai
5,0 MW biofuel boiler


2018, Visaginas
Condensing economizer for 14 MW boiler


2018, Kaunas
2,5 MW biofuel boiler and chimney height 16 m and diameter Ø800 mm


2018, Tauragė
8,0 MW 14 bar biofuel boiler


2018, Anykščiai
2,0 MW biofuel boiler with the condensing economizer and other technological equipment.


2018, Kėdainiai
Regulating valves of exhaust gases


2018, Biržai
AB "Siūlas" chimney height 14 m and diameter Ø800 mm


2018, Panevėžys
UAB "Serpantinas" supports for robots, 2 units.


2019, Pakruojis
Ring of Hardox steel


2019, Naujoji Akmene
Chimney height 29 m and diameter Ø2000 mm


2019, Naujoji Akmene
10,0 MW 6 bar biofuel boilers, economizer and 40m3 termo oil tanks 2 units


2019, Klaipėda
6,0 MW 6 bar biofuel boiler and chimney height 18 m and diameter Ø750 mm